Perfection Corporation
h o m e p r o d u c t s c o m p a n y s a l e s c o n t a c t  u s
 
 
PermasertŪ Mechanical Couplings
 
Same Installation Procedure
Nothing's changed...PE100/Bimodal PE3408 Permasert® installation procedure is the same five easy steps as our PE2406 and PE3408 products
 
Installation Step 1 Illustration   Installation Step 2 Illustration
Cut the PE piping so that the end is square.   Wipe with a clean dry cloth. Inspect the last several inches of the PE piping for damage. If any, cut again to remove damaged area.
 
Installation Step 3 Illustration   Installation Step 4 Illustration
Use the Perfection chamfering tool for a proper O.D. Chamfer. This chamfer permits the PE piping to be completely stabbed without affecting the internal seals.   Use a soft felt tip pen, crayon or grease pencil to mark the stab depth as indicated on your Permasert package instructions. The stab depth is the approximate distance from the edge of the fusion bead to the end of the fitting body.
 
Installation Step 5 Illustration
 
Stab the PE piping into the Permasert fitting so that the stab depth mark is visible:
  • Within 1/8" of moisture seal on 1/2" CTS and 1" CTS sizes
  • Within 1/4" on all other sizes through 1-1/4" CTS
  • Approximately 3/8" on 1-1/4" IPS and 2" IPS sizes
The PE piping must bottom out in the fitting. Pressure test the joint in accordance with your standard procedures. The reference mark can move outward up to an additional 3/8" during pressure testing.